News

Fastest Electric Wheelchair in the World
Fastest Electronic Wheelchair in the World | Inspirational ‘adrenaline junkie’ Jason Liversidge has beaten the World Record for the fastest motorised wheelchair. The dad-of-two, of Rise, near Skirlaugh, was diagnosed with

The history of Structurally Insulated Panels
The history of Structurally Insulated Panels | In the age of technology, and the increasing use of modern methods of construction, SIPs are achieving mainstream status. Structurally Insulated Panels (or

Normanton Insulation Manufacturer Doubles Production
Normanton Insulation manufacturer Doubles Production | A Normanton-based insulated panel manufacturer has doubled production to meet demand and created six new jobs. SIP Build UK completed its multimillion-pound manufacturing plant

New Manufacturing Base for Thriving SIP Build UK
New Manufacturing Base for Thriving SIP Build UK | Construction industry contractor SIPBuild UK has invested a six-figure sum in the development of a manufacturing plant in Normanton following a

Homes built with SIPS save £50,000 on energy bills
Homes built with SIPs save £50,000 on energy bills | Homes built with modern techniques will save their occupants nearly £50,000 on energy bills over 25 years compared to traditional houses,

It’s going to be One Hull of a final
It’s going to be One Hull of a final | The powerboat sponsored by Sip Build UK, which supplies and builds Structural Insulated Panels (SIPs) on site, is racing in the

Sip Build UK helps future-proof home in £160,000 extension
SIP Build UK – helps future-proof home in £160,000 extension | Sip Build UK has been chosen to deliver a £160,000 extension to a house in Preston Crowmarsh, South Oxfordshire. The

Sip Build UK delivers part of £460,000 refurbishment of Dales Youth Hostel
SIP Build UK – delivers part of £460,000 refurbishment of Dales Youth Hostel | Castleford-based SipBuild UK has extended the educational facilities at Malham Youth Hostel as part of a

SipBuild UK delivers school extension in five week lead time
SIP Build UK delivers school extension in five week lead time |SipBuild UK manufactured and built a new classroom and series of extensions at Meadowside CP School in Knaresborough, North